6 Commissioning/Start-up/Shutdown
34 of 80
Vitacast / Vitacast Bloc
6 Commissioning/Start-up/Shutdown
6.1 Commissioning/Start-up
6.1.1 Prerequisites for commissioning/start-up
Before commissioning/starting up the pump set, make sure that the following
conditions are met:
▪
The quality of the concrete foundation complies with the regulations.
▪
The pump set has been installed and aligned in accordance with the tolerances
specified.
▪
The pump set has been properly connected to the power supply and is equipped
with all protection devices.
▪
The pump has been primed with the fluid to be handled. The pump has been
vented. (
▪
The direction of rotation has been checked.
▪
All auxiliary connections required are connected and operational.
▪
The lubricants have been checked.
▪
The lock washers, if any, have been removed from the shaft groove.
▪
The pump (set) has been installed and connected as described in this manual.
▪
After prolonged shutdown of the pump (set), the activities required for returning
the equipment to service have been carried out.
6.1.2 Filling in lubricants
Vitacast-Bloc Grease-lubricated bearings
Grease-lubricated bearings have been packed with grease.
Vitacast Oil-lubricated bearings
Fill the bearing bracket and constant level oiler with lubricating oil.
Oil quality see (
Filling the constant level oiler with lubricating oil
CAUTION
Insufficient quantity of lubricating oil in the reservoir of the constant level oiler
Damage to the bearings!
▷
Regularly check the oil level.
▷
Always fill the oil reservoir completely.
▷
Keep the oil reservoir properly filled at all times.