6 Commissioning/Start-up/Shutdown
6.1 Commissioning/start-up
6.1.1
Prerequisites for commissioning/start-up
Before starting up the pump set make sure that the following requirements are met:
▪
The pump set has been properly connected to the electric power supply and is
equipped with all protection devices. (
⇨
Section 5.9 Page 37)
▪
The pump has been primed with the fluid to be handled. (
⇨
Section 6.1.2 Page
40)
▪
The direction of rotation has been checked. (
⇨
Section 5.10 Page 38)
▪
All auxiliary connections required are connected and operational.
▪
The transport lock has been removed.
▪
The lubricants have been checked and filled in.
▪
After prolonged shutdown of the pump (set), the activities described in
(
⇨
Section 6.4 Page 46) have been carried out.
▪
The coupling alignment has been checked.
6.1.2
Priming and venting the pump
DANGER
Risk of potentially explosive atmosphere inside the pump
Explosion hazard!
▷
Before starting up the pump, vent the suction line and the pump and prime
them with the fluid to be handled.
DANGER
Shaft seal failure caused by insufficient lubrication
Hot fluid may escape!
▷
Before starting up the pump set, vent the pump and suction line and prime
both with the fluid to be handled.
1.
Close all drains and drain lines.
2.
Vent the pump and suction line and prime both with the fluid to be handled.
In case of suction lift operation, evacuate the pump.
3.
Fully open the shut-off element in the suction line.
4.
If the discharge line is equipped with a check valve, the shut-off element in the
discharge line may remain open as long as there is some back pressure. If this is
not the case, the shut-off element in the discharge line must be closed.
5.
Fully open all auxiliary connections (barrier fluid, flushing liquid, etc).
6 Commissioning/Start-up/Shutdown
40 of 94
Omega / Omega V