6 Commissioning/Start-up/Shutdown
20 of 30
KWT51
1974.95/01-EN
6.4.2 Measures to be taken for shutdown
For a shutdown, ensure the measures for dismantling are properly implemented.
▪
For a short-term shutdown (1 to 2 months) the buffer fluid remains in the system.
▪
For a longer shutdown drain the buffer fluid and preserve the quench reservoir.
6.4.3 Returning to service
WARNING
Failure to re-install or re-activate protective devices
Risk of injury from moving parts or escaping fluid!
▷
As soon as the work is completed, properly re-install and re-activate any safety-
relevant devices and protective devices.
Before returning the KSB quench system to service, implement the following
measures:
1. Observe and take all measures required to return the pump sets to service (see
operating manual of the pump set).
2. For returning the equipment to service observe the sections on commissioning/
start-up .