6 Commissioning/Start-up/Shutdown
16 of 30
KWT51
1974.95/01-EN
6 Commissioning/Start-up/Shutdown
6.1 Safety instructions for operation
WARNING
Hot surfaces
Risk of burns!
▷
Do not touch the surface of the KSB quench system and associated components.
CAUTION
Placing loads on the quench reservoir
Damage to or failure of the quench system!
Damage to or failure of the mechanical seal!
▷
Never place a load > 3 kg on the quench reservoir.
6.2 Commissioning/Start-up
6.2.1 Prerequisites for commissioning/start-up
WARNING
Improper assembly / dismantling
Damage to the KSB quench system!
Damage to the mechanical seal!
Fluid handled escaping!
▷
Have installation / dismantling of the KSB quench system carried out by
authorised and qualified personnel only.
CAUTION
Vibrations during operation
Fatigue fracture of the piping!
Fluid handled escaping!
Mechanical seal failure!
▷
Carry out a vibration analysis prior to installation. If in doubt, contact the
manufacturer.
Before commissioning / starting up the KSB quench system, ensure that the following
requirements are met:
▪
The KSB quench system has been properly connected mechanically.
▪
All auxiliary connections required are connected and operational.
▪
After prolonged shutdown of the pump (set), the activities required for returning
the equipment to service have been carried out.