5 Installation at Site
31 of 62
Calio Pro / Calio Pro Z
1157.820/01-EN
4. Guide the electric cable through the cable gland and into the connection space.
5. Screw the union nut and joint ring on hand-tight.
6. Wire the electric cable to the terminal pair of the general fault message relay.
See wiring diagram for the general fault message.
7. Mount the cover of the terminal wiring compartment. Fasten it with the screws
(1). Tightening torque = 0.8 Nm