
III - 6
Operating preparations
3.6 Changing from working to
transport position
• Turn the rotor until the blocking arm (A) lines up with
the marked tine arm of the rotor.
SW46T011
A
SW46T009
2
3
4
• Push in the swath sheet (7).
• Swing up the guard rails (5) and (6).
• Remove the pins (2) from the folding tine arms (3).
• Swing the tine arms (3) through 180° into transport
position, fit pins (2) and secure with lynch pin (4).
SW46T013
2
3
4
1
Before changing from working to
transport position, switch off the engine
and remove the ignition key.
Please ensure that the seven tine arms (3)
(four tine arms on the left and three tine
arms on the right) are always swivelled in
transport position.
SW46T029
3
3
Summary of Contents for Swadro 46 T
Page 1: ...Rotary Swather Swadro 46 T from machine no 562 754 Operating Instructions 150 000 025 00 EN ...
Page 4: ...Foreword ...
Page 9: ...I 3 General Information B L SW46T025 B L SW46T026 ...
Page 10: ...I 4 General Information ...
Page 24: ...III 8 Operating preparations ...
Page 28: ...IV 4 Adjusting the swather ...
Page 32: ...V 4 Service and maintenance ...
Page 36: ...VII 2 Winter storage ...
Page 38: ...VIII 2 Start up after winter storage ...
Page 42: ...X 2 Faults Causes and Remedy ...
Page 43: ...X 3 Faults Causes and Remedy ...