
III - 5
Operating preparations
3.5 Changing from transport to
working position
• Slowly lower the rotor using the control valve until
the rubber buffer (1) rests on the frame.
• Remove the pins (2) from the folding tine arms
• Swing the tine arms (3) through 180° into working
position
SW46T008
2
3
4
1
SW46T009
2
3
4
SW46T010
5
6
• Secure tine arms (3) with pins (2) and lynch pin (4).
• Swing guard rails on right (5) and left (6) into working
position
Before changing from transport to
working position, switch off the engine
and remove the ignition key.
Summary of Contents for Swadro 46 T
Page 1: ...Rotary Swather Swadro 46 T from machine no 562 754 Operating Instructions 150 000 025 00 EN ...
Page 4: ...Foreword ...
Page 9: ...I 3 General Information B L SW46T025 B L SW46T026 ...
Page 10: ...I 4 General Information ...
Page 24: ...III 8 Operating preparations ...
Page 28: ...IV 4 Adjusting the swather ...
Page 32: ...V 4 Service and maintenance ...
Page 36: ...VII 2 Winter storage ...
Page 38: ...VIII 2 Start up after winter storage ...
Page 42: ...X 2 Faults Causes and Remedy ...
Page 43: ...X 3 Faults Causes and Remedy ...