Commissioning
29
Pos : 13.9 /Übersc hrift en/Übersc hrift en 2/ A-E/Anbau an den Trakt or @ 0\ mod_1199717845194_78.doc @ 34039
5.3
Mounting onto the Tractor
Pos : 13.10 /Ü berschrif ten/Ü berschrif ten 3/ K-O/ Kuppel punkte @ 9\ mod_1220531326398_78.doc @ 126608
5.3.1
Clutching points
Pos : 13.11 / BA/Ers tinbetriebnahme/ Eas yC ut/ Kuppel punkte Bild EC 7540/ 9140 @ 11\ mod_1223380066751_78. doc @ 145709
Kat.II
Kat.II
Kat.III
Kat.III
EC800030
Fig. 6
Pos : 13.12 / BA/Ers tinbetriebnahme/ Eas yC ut/ Kuppel punkte Text EC 7540/9140 @ 11\ mod_1223380216501_78. doc @ 145731
The three-point coupling for the Easy Cut 7540 is only designed for Cat. II.
The three-point coupling for the Easy Cut 9140 and Easy Cut 9140 CV is designed for Cat. II
and Cat. III.
Pos : 13.13 / BA/Ers tinbetriebnahme/ Eas yC ut/ Kuppel punkte Text EC 10000 Shift @ 41\ mod_1271850448257_78. doc @ 373476
The three-point coupling for the Easy Cut 10000 Shift is designed for Cat. II and Cat. III.
Pos : 13.14 / BA/-----Seit enumbruc h------ @ 0\ mod_1196175311226_0. doc @ 4165