
IV - 23
Control Unit
4.7.9 Menu 1-7 "Automatic unloader"
ZX400051
ZX400052
Activation and deactivation of the automatic unloader
The automatic unloader simplifies the unloading process of the machine.
With the automatic unloader activated and depending on how the machine has been equipped, the system will per-
form the following functions after the button "Open/close tailgate" has been pressed:
Calling the menu
Main menu
1 "Settings" is displayed
• You can select menu 1-7
with the rotary
potentiometer. The icon is shown in reverse
colours.
• Press the rotary potentiometer.
The display shows menu 1-7 "Automatic unloader".
The current status is displayed as an icon:
•
Automatic unloader deactivated
•
Automatic unloader active
The
icon in the upper line indicates that the
displayed status is saved.
Change and save status
• Set the desired status with the rotary potentiometer.
The
icon in the top line goes out.
• Press the rotary potentiometer. The set status is
saved and the
icon appears in the upper line.
• Use the
key to close the menu currently
displayed.
The display shows menu level
1 "Settings".
• Pressing the
key and holding it down brings up
the basic screen.
Open the tailgate:
• Locking the coaster/steering axle
• The floor conveyor supply is ready. (The symbol for
the floor conveyor supply (B) will blink) (applies only
to GD design).
By activating the PTO, the discharge
rollers are driven and the system
automatically activates the floor
conveyor supply.
The symbol for the floor conveyor
supply (B) will stop blinking.
Close the tailgate:
•
The floor conveyor supply will be turned off.
•
The tailgate closes
•
The coaster/steering axle is released
ZX000013_1
B
A
AUTO
4s
Summary of Contents for 5XL-R/GL
Page 4: ...Foreword ...
Page 8: ...4 Contents ...
Page 12: ...I 4 Generalinformation ...
Page 17: ...II 5 Safety ...
Page 24: ...II 12 Safety ...
Page 48: ...IV 6 Control Unit 4 5 Manual mode 4 5 1 Basic screen Loading operation ZX000008_1 ...
Page 84: ...IV 42 Control Unit ...
Page 92: ...IV 50 ISO operation ...
Page 104: ...VI 10 Hydraulic system ...
Page 124: ...VII 20 Maintenance ...
Page 126: ...VIII 2 Overwintering ...
Page 128: ...IX 2 Recommissioning ...
Page 130: ...X 2 Faults causes and removal ...
Page 152: ...A 22 Appendix ...
Page 153: ...A 23 Appendix ...