DK
S
N
P
GR
➔
www.docuthek.com
D
GB
F
NL
I
E
TR
CZ
PL
RUS
H
03250523
© 2014 Elster GmbH · Edition 05.14
Please read and keep in a safe place
Please read through these instructions
carefully before installing or operating. Following the
installation, pass the instructions on to the opera-
tor. This unit must be installed and commissioned
in accordance with the regulations and standards
in force. These instructions can also be found at
www.docuthek.com.
Explanation of symbols
•
, , ,
... = Action
▷
= Instruction
Liability
We will not be held liable for damage resulting from
non-observance of the instructions and non-com-
pliant use.
Safety instructions
Information that is relevant for safety is indicated in
the instructions as follows:
DANGER
Indicates potentially fatal situations.
WARNING
Indicates possible danger to life and limb.
CAUTION
Indicates possible material damage.
All interventions may only be carried out by qualified
gas technicians. Electrical interventions may only be
carried out by qualified electricians.
Conversion, spare parts
All technical changes are prohibited. Only use OEM
spare parts.
Changes to edition .
The following chapters have been changed:
– Checking the usage
– Installation
– Preparing commissioning
– Commissioning
– Technical data
– Logistics
– Declaration of Incorporation
Operating instructions
D
GB
F
NL
I
E
GB-1
Translation from the German
Safety
Contents
Burners for gas
ZIC
Burners for gas ZIC . . . . . . . . . . . . . . . . . . . . .
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Checking the usage . . . . . . . . . . . . . . . . . . . . .
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installing the ceramic tube . . . . . . . . . . . . . . . . . 3
Installation on the furnace . . . . . . . . . . . . . . . . . 4
Air connection, gas connection . . . . . . . . . . . . . 4
Installing the burner insert . . . . . . . . . . . . . . . . . 5
Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Preparing commissioning . . . . . . . . . . . . . . . . 6
Determining the flow rates . . . . . . . . . . . . . . . . . 6
Notes on the flow rate curve . . . . . . . . . . . . . . . 7
Restrictors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Hot-air compensation . . . . . . . . . . . . . . . . . . . . 7
Commissioning. . . . . . . . . . . . . . . . . . . . . . . . . 8
Igniting and adjusting the burner . . . . . . . . . . . . 8
Tightness test. . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Cooling air . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Blocking and recording the settings . . . . . . . . . 10
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . 0
Technical data . . . . . . . . . . . . . . . . . . . . . . . .
Logistics . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Declaration of Incorporation. . . . . . . . . . . . . 4
Certification . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Contact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4