Tightness test

 1 

 Close the gas solenoid valve.

  

 To be able to check the tightness, shut off the 

downstream pipeline close to the valve.

N

2

0

0

N

2

3

6

4

7

8

5

0

≤ 1,5 × p

u max

≤ 1,5 × p

u max

 

Open the 

solenoid 

valve.

 9 

 Tightness OK: open the pipeline.

 

Pipeline leaking: replace O-ring on flange, see 
accessories, seal set for sizes 1 – 3. Then check 
for tightness once again.

 

Unit leaking: remove the unit and return it to the 
manufacturer.

Commissioning

Setting the flow rate

 

At the factory, the gas solenoid valve is adjusted 

for maximum flow rate Q.

 

The markings on the cover cap can be used for 

coarse adjustment of the flow rate.

 

The cover cap can be rotated without changing 

the current flow rate.

 

Allen key: 2.5 mm.

 

Do not turn beyond the “max.” setting.

Q [%]

max.

 

min.

100

0

U

-

+

min.

max.

 

The VAS remains tight even if the adjusting screw 

is overturned.

Setting the start gas rate on VAS../L, VCS..L

 

The start gas rate can be set by turning the 

damping unit a maximum of 5 turns.

 

There must be a period of 20 seconds between 

switching the valve off and on again so that the 
damping is fully effective.

 

Loosen the M5 setscrew (2.5 mm hexagon 
socket), but do not unscrew completely.

- +

3

4

1

2

Turn 

clockwise 

to the zero 

setting/as far 

as possible.

Screw the M5 

setscrew back 

in.

Setting the damping speed

 

The opening speed can be influenced by turning 

the nozzle screw on the damping unit.

 CAUTION

Attention! To avoid leakage, please observe the 

following:

–   If the nozzle screw is turned by more than 1 turn, 

the damping unit will leak and will have to be 
replaced.

 

Turn the nozzle screw a maximum of ½ a turn in 

the appropriate direction.

- +

Replacing the actuator

 

The actuator adapter set is enclosed with new 

actuators.

VAS 2/3

VAS 1

 

The seals of the actuator adapter set are covered with 

a non-stick coating. No additional grease is required.

Summary of Contents for VAS Series

Page 1: ...Electrical interventions may only be carried out by qualified electricians Conversion spare parts All technical changes are prohibited Only use OEM spare parts Changes to edition 10 17 The following c...

Page 2: ...ve is not damaged during installation and operation Sealing material and dirt e g thread cuttings must not be allowed to get into the valve hous ing A filter must be installed upstream of every sys te...

Page 3: ...lenoid valve VAS 1 a DN 25 differential pressure orifice with outlet opening d 30 mm 1 18 must be inserted at the outlet of the pressure regulator In the case of pressure regulator VAx 115 or VAx 120...

Page 4: ...ing Type 2 the en closure openings shall be closed with fittings rated UL Type 2 3 3R 3RX 3S 3SX 3X 4X 5 6 6P 12 12K or 13 Gas solenoid valves shall be protected by a branch circuit protective device...

Page 5: ...re is a risk of interference between valve voltage and proof of closure switch voltage To make wiring easier the connection terminal for the proof of closure switch can be removed 1 3 2 LV1 N 1 3 2 LV...

Page 6: ...if the adjusting screw is overturned Setting the start gas rate on VAS L VCS L The start gas rate can be set by turning the damping unit a maximum of 5 turns There must be a period of 20 seconds betwe...

Page 7: ...VAS 2 3 use the small seal from the actuator adapter set and only one of the large seals VAS 1 3 10 11 Slide seal under the second groove 12 Position new actuator 13 Follow the reverse procedure when...

Page 8: ...4 5 3 10 9 Maintenance CAUTION In order to ensure smooth operation check the tightness and function of the VAS Once per year twice per year in the case of biogas check for internal and external tight...

Page 9: ...ion from the switching point during testing pursuant to EN 1854 Gas pressure switches 15 Bypass pilot gas valves 1 Disconnect the system from the electrical power supply 2 Shut off the gas supply 3 Pr...

Page 10: ...10 mm 0 39 at the outlet of the main valve if the bypass valve s outlet flange is designed as a blind flange For the pilot gas valve insert sealing plug F at the outlet of the main valve if the pilot...

Page 11: ...s piloto ppna bypass eller t ndgasven tilen pne bypass eller tenn gassventilen Otev t obto kov ventil nebo zapalovac plynov ventil Otworzy zaw r obej ciowy lub zaw r gazu zap onowego Tightness control...

Page 12: ...nnect the system from the electrical power supply Shut off the gas supply 16 5 4 3 8 7 6 9 10 13 12 11 15 14 In both connection boxes push through the knock out for the cable gland set then remove the...

Page 13: ...AMSL Ambient temperature 20 to 60 C 4 to 140 F no condensation permitted Long term use in the upper ambient temperature range accelerates the ageing of the elastomer ma terials and reduces the servic...

Page 14: ...3 A VAS G 12 30 V DC 2 mA 0 1 A Switching frequency of proof of closure switch max 5 x per minute Switching current A Switching cycles cos 1 cos 0 6 0 1 500 000 500 000 0 5 300 000 250 000 1 200 000 1...

Page 15: ...in ac cordance with local regulations Disposal Components are to be disposed of separately in accordance with local regulations Certification Declaration of conformity We the manufacturer hereby decl...

Page 16: ...earch Class 7400 and 7411 Safety overpressure slam shut valves Designed for applications pursuant to NFPA 85 and NFPA 86 ANSI CSA approved Canadian Standards Association ANSI Z21 21 and CSA 6 5 UL lis...