 After completing the wiring, tightness test and 

commissioning for the TC, refit the housing cover 
on the TC.

Cable gland set for double solenoid valves

 

When wiring a double solenoid valve, the connection 
boxes are to be connected using a cable gland set.

VCx 1

VCx 2

VCx 3

 

Order No. for  
size 1: 74921985, size 2: 74921986, 
size 3: 74921987.

 

We recommend preparing the connection boxes 

before the double solenoid valve is installed in 
the pipework. Alternatively, one of the actua-
tors must be dismantled as described below 
and reinstalled rotated by 90° in preparation for 
installation of the double solenoid valve.

 

The cable gland set can only be used if the con-

nection boxes are at the same height and on 
the same side.

 1 

  Disconnect the system from the electrical power 

supply.

  

 Shut off the gas supply.

16

5

4

3

8

7

6

9

10

13

12

11

19

18

17

15

14

  

Ventile 

elektrisch 

anschließen, 

siehe Kapitel 

„Verdrahten“.

 

In both connection boxes, push through the 
knock-out for the cable gland set – then remove 
the covers. The covers must not be taken off 
before pushing through the knock-outs as it pre-
vents damage to the connection boxes.

16

5

4

3

8

7

6

9

10

13

12

11

19

18

17

15

14

  

Ventile 

elektrisch 

anschließen, 

siehe Kapitel 

„Verdrahten“.

16

5

4

3

8

7

6

9

10

13

12

11

19

18

17

15

14

   Connect 

the valves to 

the electrical 

power supply, 

see section 

entitled “Wiring”.

Attachment block

 

For locked installation of pressure gauge or other 
accessories, the attachment block is mounted 
to the solenoid valve.

 

Order No. 74922228

 1 

  Disconnect the system from the electrical power 

supply.

  

 Shut off the gas supply.

 

Use the enclosed self-tapping screws for instal-
lation.

N

2

 

 1,5 x p

u max

N

2

 

 1,5 x p

u max

5

4

3

7

6

8

11

 9 

 Shut off the downstream gas pipeline close to 

the solenoid valve.

 10 

 Open the solenoid valve.

N

2

 

 1,5 x p

u max

N

2

 

 1,5 x p

u max

5

4

3

7

6

8

11

Summary of Contents for VAS Series

Page 1: ...Electrical interventions may only be carried out by qualified electricians Conversion spare parts All technical changes are prohibited Only use OEM spare parts Changes to edition 10 17 The following c...

Page 2: ...ve is not damaged during installation and operation Sealing material and dirt e g thread cuttings must not be allowed to get into the valve hous ing A filter must be installed upstream of every sys te...

Page 3: ...lenoid valve VAS 1 a DN 25 differential pressure orifice with outlet opening d 30 mm 1 18 must be inserted at the outlet of the pressure regulator In the case of pressure regulator VAx 115 or VAx 120...

Page 4: ...ing Type 2 the en closure openings shall be closed with fittings rated UL Type 2 3 3R 3RX 3S 3SX 3X 4X 5 6 6P 12 12K or 13 Gas solenoid valves shall be protected by a branch circuit protective device...

Page 5: ...re is a risk of interference between valve voltage and proof of closure switch voltage To make wiring easier the connection terminal for the proof of closure switch can be removed 1 3 2 LV1 N 1 3 2 LV...

Page 6: ...if the adjusting screw is overturned Setting the start gas rate on VAS L VCS L The start gas rate can be set by turning the damping unit a maximum of 5 turns There must be a period of 20 seconds betwe...

Page 7: ...VAS 2 3 use the small seal from the actuator adapter set and only one of the large seals VAS 1 3 10 11 Slide seal under the second groove 12 Position new actuator 13 Follow the reverse procedure when...

Page 8: ...4 5 3 10 9 Maintenance CAUTION In order to ensure smooth operation check the tightness and function of the VAS Once per year twice per year in the case of biogas check for internal and external tight...

Page 9: ...ion from the switching point during testing pursuant to EN 1854 Gas pressure switches 15 Bypass pilot gas valves 1 Disconnect the system from the electrical power supply 2 Shut off the gas supply 3 Pr...

Page 10: ...10 mm 0 39 at the outlet of the main valve if the bypass valve s outlet flange is designed as a blind flange For the pilot gas valve insert sealing plug F at the outlet of the main valve if the pilot...

Page 11: ...s piloto ppna bypass eller t ndgasven tilen pne bypass eller tenn gassventilen Otev t obto kov ventil nebo zapalovac plynov ventil Otworzy zaw r obej ciowy lub zaw r gazu zap onowego Tightness control...

Page 12: ...nnect the system from the electrical power supply Shut off the gas supply 16 5 4 3 8 7 6 9 10 13 12 11 15 14 In both connection boxes push through the knock out for the cable gland set then remove the...

Page 13: ...AMSL Ambient temperature 20 to 60 C 4 to 140 F no condensation permitted Long term use in the upper ambient temperature range accelerates the ageing of the elastomer ma terials and reduces the servic...

Page 14: ...3 A VAS G 12 30 V DC 2 mA 0 1 A Switching frequency of proof of closure switch max 5 x per minute Switching current A Switching cycles cos 1 cos 0 6 0 1 500 000 500 000 0 5 300 000 250 000 1 200 000 1...

Page 15: ...in ac cordance with local regulations Disposal Components are to be disposed of separately in accordance with local regulations Certification Declaration of conformity We the manufacturer hereby decl...

Page 16: ...earch Class 7400 and 7411 Safety overpressure slam shut valves Designed for applications pursuant to NFPA 85 and NFPA 86 ANSI CSA approved Canadian Standards Association ANSI Z21 21 and CSA 6 5 UL lis...

Reviews: