OPERATION
5
15
OPTICHECK
www.krohne.com
06/2014 - 4003706601 - QS OPTICHECK R01 en
Verification
press "Run"
the different verification steps are performed and evaluated
hints to solve failing tests are shown
a progress of the tests is shown
verification may take up to 10min
Reconnection
power off the converter
restore the initial connections between flow converter and process
cable
GDC connection is still applied
power on the converter
press run
OPTICHECK performs a basic test to compare the initial installation
condition
After finishing the test, remove GDC connection and close the converter
housing
Step
Description
Result
OPTICHECK shows the completion of the above steps and three buttons
Factory settings: flowmeter calibration data are compared to factory
calibration data
Create report: the certificate and the detailed report are generated as
pdf
History: pressing this button shows all verification runs;
- to finish comparison with factory settings
- to generate a final report
- to show the report again
About
This is not a verification step
The warranty, trademark and liability information is shown here
The manufacturer address is also shown
Step
(navigation tab)
Description