background image

Assemble the Towers

Now you can assemble the towers using 1 1/4" coarse-thread Kreg Pocket-Hole Screws, as shown. Make sure that you have

both Tower Sides oriented correctly, and that you position the Tower Rail at the top end.

Make the Large Box Parts

Now you can assemble the large boxes using 1 1/4" coarse-thread Kreg Pocket-Hole Screws, as shown. Make sure that you

have both Large Box Sides oriented correctly, and that you position the Rail at the top end.

2

3

Page 7 of 13

Summary of Contents for Garage Storage and Work Center

Page 1: ...nit packs almost 40 feet of shelving into a package that s just 8 wide by 6 tall Plus it s equipped with a fold down workbench and a pegboard area for hanging tools Best of all it s built from four sh...

Page 2: ...evel framing square tape measure sander stud finder Materials Wood Products Board 1x2 X 96 2 Plywood 3 4 X 48 X 96 4 Pegboard 1 4 X 24 X 48 1 Hardware Supplies 1 1 4 Coarse thread Kreg Pocket Hole Scr...

Page 3: ...4 X 22 1 2 4 Large Box Rail 3 4 Ply X 3 1 2 X 22 1 2 2 Large Box Shelf 3 4 Ply X 15 3 4 X 22 3 8 2 Small Box Side 3 4 Ply X 15 3 4 X 12 4 Small Box Top Bottom 3 4 Ply X 15 3 4 X 22 1 2 4 Small Box Ra...

Page 4: ...Page 4 of 13...

Page 5: ...Page 5 of 13...

Page 6: ...d as shown in the cutting diagram Then with your Kreg Pocket Hole Jig set for 3 4 thcik material drill pocket holes in the Tops Bottoms Dividers and Rails as shown After that you can Drill holes for a...

Page 7: ...both Tower Sides oriented correctly and that you position the Tower Rail at the top end Make the Large Box Parts Now you can assemble the large boxes using 1 1 4 coarse thread Kreg Pocket Hole Screws...

Page 8: ...ge Box Sides oriented correctly and that you position the Rail at the top end Make the Small Box Parts Cut the parts for a pair of small boxes four Small Box Sides two Small Box Tops two Small Box Bot...

Page 9: ...mall boxes using 1 1 4 coarse thread Kreg Pocket Hole Screws as shown Make Ledgers Next you can create a Lower Ledger and an Upper Ledger from 1x2 boards as shown in the cutting diagram Then drill poc...

Page 10: ...r by driving 3 screws through it and into the studs or wall anchors Mount the Towers and Small Boxes Start at one end to install the first tower You ll want a helper for this Rest the tower on the Low...

Page 11: ...n place attach all of the boxes and towers to one another To do that drive several screws through one side and into the adjacent side You can use 1 1 4 coarse thread Kreg Pocket Hole Screws for this J...

Page 12: ...erside of the Large Boxes and then secure the cleat to the wall It doesn t need the heavy duty anchoring that the Ledgers require Just drive a couple screws into the studs or into wall anchors Then at...

Page 13: ...ed Products Accu Cut Expansion Pack 89 99 Accu Cut 79 99 Rip Cut 39 99 Adaptive Cutting System Plunge Saw 299 99 Adaptive Cutting System 62 Guide Track 99 99 Adaptive Cutting System Master Kit Page 13...

Reviews: