Kreg Garage Storage and Work Center Assembly Instructions Manual Download Page 12

Install the Bench and Pegboard

To mount the bench. Slide it into position on the Small Boxes. Attach the Hinge Plate by driving 1 1/4" coarse-thread pocket

hole screws into the Small Box Tops.

If you want to add a Pegboard panel, cut it to size, as shown in the cutting diagram. Also cut a Pegboard Cleat from a 1x2

board. Measure down 16 3/4" from the underside of the Large Boxes, and then secure the cleat to the wall. It doesn’t need

the heavy-duty anchoring that the Ledgers require. Just drive a couple screws into the studs or into wall anchors. Then

attach the Pegboard to the cleat and the Upper Ledger with 3/4" screws.

You can leave your storage unit bare but adding finish or paint will protect it and keep it looking good. We just added a coat

of wipe-on a polyurethane. Finish the Shelves, as well, and then put them in place on shelf pins. Then load up your storage

and work center!

12

Page 12 of 13

Summary of Contents for Garage Storage and Work Center

Page 1: ...nit packs almost 40 feet of shelving into a package that s just 8 wide by 6 tall Plus it s equipped with a fold down workbench and a pegboard area for hanging tools Best of all it s built from four sh...

Page 2: ...evel framing square tape measure sander stud finder Materials Wood Products Board 1x2 X 96 2 Plywood 3 4 X 48 X 96 4 Pegboard 1 4 X 24 X 48 1 Hardware Supplies 1 1 4 Coarse thread Kreg Pocket Hole Scr...

Page 3: ...4 X 22 1 2 4 Large Box Rail 3 4 Ply X 3 1 2 X 22 1 2 2 Large Box Shelf 3 4 Ply X 15 3 4 X 22 3 8 2 Small Box Side 3 4 Ply X 15 3 4 X 12 4 Small Box Top Bottom 3 4 Ply X 15 3 4 X 22 1 2 4 Small Box Ra...

Page 4: ...Page 4 of 13...

Page 5: ...Page 5 of 13...

Page 6: ...d as shown in the cutting diagram Then with your Kreg Pocket Hole Jig set for 3 4 thcik material drill pocket holes in the Tops Bottoms Dividers and Rails as shown After that you can Drill holes for a...

Page 7: ...both Tower Sides oriented correctly and that you position the Tower Rail at the top end Make the Large Box Parts Now you can assemble the large boxes using 1 1 4 coarse thread Kreg Pocket Hole Screws...

Page 8: ...ge Box Sides oriented correctly and that you position the Rail at the top end Make the Small Box Parts Cut the parts for a pair of small boxes four Small Box Sides two Small Box Tops two Small Box Bot...

Page 9: ...mall boxes using 1 1 4 coarse thread Kreg Pocket Hole Screws as shown Make Ledgers Next you can create a Lower Ledger and an Upper Ledger from 1x2 boards as shown in the cutting diagram Then drill poc...

Page 10: ...r by driving 3 screws through it and into the studs or wall anchors Mount the Towers and Small Boxes Start at one end to install the first tower You ll want a helper for this Rest the tower on the Low...

Page 11: ...n place attach all of the boxes and towers to one another To do that drive several screws through one side and into the adjacent side You can use 1 1 4 coarse thread Kreg Pocket Hole Screws for this J...

Page 12: ...erside of the Large Boxes and then secure the cleat to the wall It doesn t need the heavy duty anchoring that the Ledgers require Just drive a couple screws into the studs or into wall anchors Then at...

Page 13: ...ed Products Accu Cut Expansion Pack 89 99 Accu Cut 79 99 Rip Cut 39 99 Adaptive Cutting System Plunge Saw 299 99 Adaptive Cutting System 62 Guide Track 99 99 Adaptive Cutting System Master Kit Page 13...

Reviews: