Directions
Start with the Tower Parts
Cut the parts for a pair of towers—four Tower Sides, two Tower Tops, two Tower Bottoms, two Tower Dividers, two Tower
Rails, and six Tower Shelves to size from 3/4" plywood, as shown in the cutting diagram. Then, with your Kreg® Pocket-Hole
Jig set for 3/4"-thcik material, drill pocket holes in the Tops, Bottoms, Dividers, and Rails, as shown.
After that, you can Drill holes for adjustable-shelf pins in the Tower Sides, as shown. The easiest way to do this is by using a
Kreg Shelf Pin Jig. That way, you can be assured of getting consistent spacing with all of the holes.
1
Page 6 of 13
Summary of Contents for Garage Storage and Work Center
Page 4: ...Page 4 of 13...
Page 5: ...Page 5 of 13...