Operating Instructions
OIC 12en Edition 08/2016
25
Recommissioning the pump
Operation
Tab. 1 Measures for operation interruption
Tab. 2 Measures depending on the behaviour of the pumped liquid
► Drain the pump via the pressure and suction line.
Recommissioning the pump
► Carry out all the steps as for the commissioning process, see "Commissioning", page 19.
Pump is
Measure
□
Shut down for longer period
► Measures depend on pumped liquid, see Tab. 2, page 25.
□
Drained
► Flush pump with flushing liquid.
► Close the pressure and suction-side shut-off devices.
□
Dismantled
► Disconnect the motor from the power supply and secure it
against being switched back on, see "Removing the pump",
page 18.
□
stored
► Observe the measures for storing and preservation, see "Sto-
rage", page 12 and see "Preservation", page 13.
Behaviour of the pumped liquid
Duration of the operation interruption
Short
Long
□
Solids sediment
► Rinse the pump.
► Rinse the pump.
□
Congealed/frozen
□
No corrosive burden
► Drain the pump.
► Drain the pump.
□
Congealed/frozen
□
Corrosive burden
► Drain the pump.
► Drain the pump.
► Preserve the pump.
□
Remains liquid
□
No corrosive burden
—
—
□
Remains liquid
□
Corrosive burden
—
► Drain the pump.
► Preserve the pump.