10
GLASS FRAME / SCREEN FRONT
REMOVE GLASS FRAME ASSEMBLY
A. Locate spring-loaded latches securing glass frame assembly at bottom of firebox.
B. Using glass latch tool (included in components packet) pull bottom latches out and up to
release glass frame assembly latch tabs.
C. Lift glass frame assembly up off tabs located at top of firebox.
INSTALL GLASS FRAME ASSEMBLY
A. Make certain bottom latches are pushed down to allow for easier installation.
B. Align slots at top of glass frame assembly over tabs at top of firebox while lowering
bottom of glass frame assembly into position.
C. Using glass latch tool, pull latches out and down over latch tabs to secure glass frame
assembly bottom.
INSTALLATION
COMBUSTION AIR VENTING OPTIONS
OPTION 1:
FULL CONNECTION: Combustion air intake pipe is run entire chimney length and connected to termination cap.
OPTION 2:
STUB VENTING: Combustion air intake pipe is extended a minimum of 4ft. (1.22m) past damper opening into
existing chimney. It is not connected to termination cap.
Upper tab (1 ea. side)
Lower latch (1 ea. side)
Insert glass latch tool here
To install: Align tabs on back of frame with slots on insert, set into position.
To remove: Lift frame up and out of slots.
APPROVED VENTING
MANUFACTURER
APPROVED CAPS
Kozy Heat
816-CL Vent System
ICC
TM-IVT
TM-SVT
Selkirk
4DT-VC
American Metals
4DVC
Simpson Dura-Vent
46DVA-VCH
Security
3PDVCV
Metal Fab
4DVT
HS-C33U99
RLH
HS-C33F1313
HS-CD3333-1313
SCREEN FRONT
(sold separately)
WARNING
DO NOT OPERATE THIS FIREPLACE WITH GLASS REMOVED, CRACKED OR BROKEN. REPLACEMENT OF GLASS FRAME
ASSEMBLY, #JOR-057T SHOULD BE DONE BY A LICENSED OR QUALIFIED SERVICE PERSON.
DO NOT REMOVE THESE COMPONENTS WHEN HOT!
ATTENTION
All steps as outlined in ‘PREPARE EXISTING FIREPLACE’ must be completed before continuing with this installation.
Follow instructions from vent pipe manufacturer as well as venting requirements as outlined in this installation manual.
Figure 10a
Latch tab