Page 4
SAFETY INSTRUCTIONS
The pellet heater system may only be operated be in faultless technical condition. Malfunctions
and damage which affect or could affect safety must be corrected immediately by our trained
personnel.
The assembly may only be conducted by our customer service, or by a certified specialist. The
system is equipped with rotating parts, which move with a relatively large turning movement
(crushing hazard).
Under the casing and in the terminal box there are voltaged components. Do not remove the
casing or terminal box.
Never open the inspection openings of the boiler while in continuous operation, hot exhaust gas
and dust may escape.
The system should be turned off before the implementation of maintenance work. Wait until the
pellet boiler has cooled down (check the temperature on the display).
The boiler needs to be switched off before carrying out the cleaning of the chimney. Wait until
the pellets have burned down completely (approx. 20 minutes
–
danger of explosion through
back up of exhaust gas.
Never pour flammable liquids into the burner.
Never perform independent repair work on our system, call trained personnel!
Put a signboard into the heating room that forbids to smoke or to use open light or fire.
A certified fire extinguisher must be installed in the boiler room.
Ensure enough air supply in the heating room.
Secure the boiler room against unauthorized access, especially by children.
Once a month, test the boiler doors and the water connections for leaks and damage.
Once a year, test the safety temperature limiter.
Safety and monitoring devices may not be removed, bypassed or taken out of service in any
other way.
Summary of Contents for SLIMPEL
Page 8: ...Page 8 SPECIFICATIONS SLIMPEL 25...
Page 9: ...Page 9 SLIMPEL 40...
Page 10: ...Page 10 AIR ELIMINATOR VALVE BLOW OFF...
Page 14: ...Page 14 This page intentionally left blank...
Page 21: ...Page 21...