5
GB-088B_f.
circulation
domestic hot water
cold water
return of heating medium
heating medium
supply
coil's supply- external heating
source
5. Boiler's installation to the water
system has to be carried out in
accordance with valid norms
safety valve must be installed on
cold water inlet.
6. Hot water outlet has to be
connected to the 3/4″connection
which is placed next to the
supplying connection.
7. If in the DHW system there is
a circuit, it has to be connected to
the 3/4″ connection which is placed
next to the hot water connection,
whereas the circuit pump has to
be connected to CYRK clasp on
the terminal block.
8. Extend the pipes placed on the
back wall of the device, responsible
for safety valve's leak, and locate
them as near the floor drain as
it's possible. (Safe and reliable
operation, point 12.).
9. Connect the boiler to the electrical
system.
10. Fix internal (room) and external
temperature sensors and other
external appliances which
cooperate acc. to 'Connection of
external appliances & Controls'.
11. Once the above steps are
completed, you can start the boiler
and perform venting procedure.
(Configuration-Pump-Venting)
12. Set the max. temperature of the
heating medium in the installation
(Configuration-Central heating-
Max power temperature).
EKD
EKD