Kospel EKD.M3 Assembly And Operating Instructions Manual Download Page 19

19

GB-088B_f.

For  central  heating  circulation  and  hot  water 

tank in a daily harmonogram set starting time 

(3) and finishing time (4) of maintaining chosen 

temperature (5) in the room (central heating) or 

of hot water (storage). Outside these periodically 

set values, economy temperature will be kept 

both in the room and the storage. To change 

daily  program  select  with  the  navigation  dial 

chosen time period and confirm it by pressing 

the  dial. The  edition  screen  flashes,  use  the 

navigation  dial  to  set  new  value  (hour  and 

minutes separately) and confirm it by pressing 

the dial. At the same time, next screen starts to 

flash allowing edition of next parameters.

Last  editable  time  position  is  a  command. 

To  confim  changes  use  the  dial  to  select  

a command, ′accept′ 

 and press the dial to 

finish editing.

To delete time settings edit a given time, then, 

by pressing the dial, get to commands, choose 

′delete′  , and confirm it by pressing the dial.

To  add  new  time  settings,  choose  previous 

time  position,  then  by  turning  the  dial  go  to 

commands, choose ′add′  , and by pressing 

the dial add new time settings, which can be 

adjusted to user’s needs (description above).

Daily schedule: 

CH PROGRAM               No.1

END

1  6:00  -  9:15  

2 15:20  -  22:15  

2

3

4

5

6

1

 [1]  -  time period panel

 [2]  -  no.  of  time  frame  according  to 

schedule (max 5)

 [3]  -  time  of  starting  the  selected  tem-

perature

 [4]  -  time of finishing the selected tem-

perature

 [5]  -  temperature selection

 [6]  -  command (active when editing):
     

 accept

     

 delete

     

 add

   

Summary of Contents for EKD.M3

Page 1: ...Bi functional Electric Central Heating Flow Boiler EKD M3 Assembly and operating instructions...

Page 2: ...get more detailed information about recycling this product you should contact the local government unit waste management service or the shop where this product has been purchased This appliance is not...

Page 3: ...water storage must not exceed 0 3 MPa If system s pressure is higher than 0 6MPa pressure reducing valve must be fitted before cylinder 12 Water dripping from safety valves down pipe is a natural occu...

Page 4: ...ll safety armature Temperature of heating medium supply and return Capacity of central heating system Pressure in central heating system C l bar 85 70 116 1 5 70 55 158 55 45 206 50 40 230 45 35 256 1...

Page 5: ...onnection whereas the circuit pump has to be connected to CYRK clasp on the terminal block 8 Extend the pipes placed on the back wall of the device responsible for safety valve s leak and locate them...

Page 6: ...or boilers of 4kW 6kW and 8kW PNL connection points of neutral protective and phase conductors 1 temperature limiter 2 additional conductors for single phase system only FUN MA RT Tcyl Tos Tr M SUPPLY...

Page 7: ...boiler s work to the mode of maintaining the temperature previously set in the configuration menu Configuration FUN entry Room thermostat entry RT This optional entry is responsible for boiler s contr...

Page 8: ...ondition of the anode must be inspected annually The anode must be replaced once every 18 months Heat up the water above 70 C periodically for hygiene reasons Failures or malfunctions notify to the ma...

Page 9: ...protective conductor from the bottom and upper lid Undo two screws holding upper lid 3 4 and take the lid out by tilting it towards the back 5 Turn off the cut off valve on cold water supply pipe tur...

Page 10: ...ply cable circulation heating medium supply heating medium return 1 expansion vessel DHW 2 expansion vessel CH 3 pump CH 4 power board 5 safety valve CH 3bar 6 safety valve DHW 6bar 7 anode 8 electric...

Page 11: ...ice configuration allows configuration of the system heating to the conditions of the facility available for specialized services and preview of boiler s input and output signals party holiday manual...

Page 12: ...e TURBO heating up the maximum parameters until the set room temperature is reached Implementation of the frost protection program Storage disinfection Circulation pump venting Temperature settings fo...

Page 13: ...rames which can have one of the roomtemperaturesets In any other case the economic temperature will be activated Setting up daily programs procedure is described in Daily Schedule paragraph Weekly ass...

Page 14: ...ot water is heated in order to achieve the best possible energy efficiency class in accordance with the terms of the ErP Directive Individual customized to user s needs switching time and water temper...

Page 15: ...ow start disinfection manually irrespective of a day and time set previously DATE TIME setting current system time year month day of the month and day of the week hour INTERFACE Brightness MIN setting...

Page 16: ...of input and output signals of the boiler Configuration adaptation of the boiler to the heating system in the facility Changes in the configuration menu are possible after entering an access code Whe...

Page 17: ...on and re entering MENU items select settings of the remaining parameters TURBO ROOM TEMP HYSTERESIS room temperature fall triggers this function HOT WATER TANK No turns off hot water for the Turbo fu...

Page 18: ...mains service speed transmission speed on the mains INLET FUN selection of reaction to closing FUN inlet either setting economy temperature or frost protection PRESSURE CONTROL no switching the contr...

Page 19: ...ing edition of next parameters Last editable time position is a command To confim changes use the dial to select a command accept and press the dial to finish editing To delete time settings edit a gi...

Page 20: ...ired temperature is reached in a room This function can start automatically when room s temperature falls down by the set room temperature hysteresis Automatic work is set in menu CONFIGURATION TURBO...

Page 21: ...in the installation Correlation between outside temperature and heating installation s temperature can be presented in a graphical form of so called heating curve The diagram below presents a compilat...

Page 22: ...Pa 150 Bypass valve kPa Adjustable 10 50 Safety valve MPa Opening pressure 0 3 Boiler s connections G 3 4 inside thread DOMESTIC HOT WATER CYLINDER Surface area of coil m2 1 Power of coil in temp 85 6...

Page 23: ...storage 15 C 55 C min 107 72 54 107 72 54 EKD M3 BOILER 12 16 20 24 Rated power kW 12 16 20 24 Rated voltage 400V 3N Rated current A 3x17 4 3x23 1 3x28 8 3x34 6 Min connecting wires section mm2 5 x 2...

Page 24: ...KOSPEL S A 75 136 Koszalin ul Olchowa 1 tel 48 94 31 70 565 serwis kospel pl www kospel pl...

Reviews: