5.1
Hardware Installation Procedure
All
Kontron racks are configured and tested at the factory according to the Quality procedures and instructions
developed and implemented at Kontron, in accordance with the ISO 9000 standards.
The installation and the initial start-up of a Kontron rack must be performed by personnel who have appropriate
training for Kontron hardware.
5.2
Rack Maintenance Procedure
When the operating conditions for the R4U8S rack, given in Chapter 2, are implemented the rack does not require
any particular preventive maintenance.
Maintenance on the fixed parts of the R4U8S rack: the card tray, the VME backplane, the fans, and the power
supply must be performed at the Kontron operation center or in a repair shop that specializes in this equipment.