UAB AMALVA we reserve the right to make changes without prior notice
9
V2-C5-15-03-v1
outdoor intake
supply air
extract indoor
exhaust air
VERSO-S
VERSO-P/PCF
VERSO-R/RHP
IS-1
Air handling unit inspection doors on the right; supplied airflow into room is on the bottom of the unit.
IS-2
Air handling unit inspection doors on the left; supplied airflow into room is on the bottom of the unit.
IS-3
Air handling unit inspection doors on the right; supplied airflow into room is on the top of the unit.
IS-4
Air handling unit inspection doors on the left; supplied airflow into room is on the top of the unit.
1.6. VERSO Air Handling Units Composing Options