.
MAINTENANCE
SERVICE PROCEDURE
REPLACEMENT OF TOGGLE PLATE
1. Remove rubber plate (1) and swing jaw cover (2).
2. Detach each working deck in the order of crusher interior
maintenance floor (3) and crusher front maintenance floor (4).
3. Remove rubber cover (2) that is spread over the toggle plate.
(M10 bolt x 10 pieces)
4. Pass a wire rope through an eyebolt on the toggle plate (5) to
lift it up provisionally.
Insert the eyebolt through a tap hole on the toggle block side.
Tool to use
Eyebolt (M20): Accessory Tool No.16
REMARK
When replacing a worn toggle plate, pass a wire rope through a
long hole on the toggle plate, because it has been deformed, and
lift it up provisionally,.
4 - 50
https://tractormanualz.com
Summary of Contents for GALEO BR550JG-1
Page 1: ...https tractormanualz com...
Page 2: ...1 1 https tractormanualz com...
Page 4: ...FOREWORD FOREWORD 1 3 https tractormanualz com...
Page 5: ...FOREWORD FOREWORD 1 4 https tractormanualz com...
Page 14: ...2 1 https tractormanualz com...
Page 19: ...SAFETY SAFETY LABELS POSITIONS OF SAFETY PICTOGRAMS 2 6 https tractormanualz com...
Page 50: ...3 1 https tractormanualz com...
Page 93: ...OPERATION OPERATION CHECK OF JAW CRUSHER AND RELATED ACCESSORIES 3 44 https tractormanualz com...
Page 117: ...OPERATION OPERATION UNIT OPERATOR S POSITION AT WORKSITE 3 68 https tractormanualz com...
Page 145: ...OPERATION TRANSPORTATION 3 96 https tractormanualz com...
Page 171: ...4 1 https tractormanualz com...
Page 181: ...MAINTENANCE WEAR PARTS 4 11 https tractormanualz com...
Page 183: ...MAINTENANCE WEAR PARTS 4 13 https tractormanualz com...
Page 189: ...MAINTENANCE STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS 4 19 https tractormanualz com...
Page 256: ...5 1 https tractormanualz com...
Page 258: ...SPECIFICATIONS SPECIFICATIONS 5 3 https tractormanualz com...
Page 259: ...6 1 https tractormanualz com...
Page 275: ...ATTACHMENTS OPTIONS MUCK DISCHARGE CONVEYOR 6 17 https tractormanualz com...