.
OPERATION
OPERATION
CHANGE OF MACHINE FROM OPERATION POSTURE TO TRANSPORTATION POSTURE
1. When transporting the feeder, insert securing pins into the two holes on the right and left sides at the front, and
tighten the stopper bolts and washers.
2. Remove the wedges at the right and left corners of the hopper. [Wedge AGL height: 3.4 m (11 ft 2 in)]
Working mode:
(1)Use a ladder or scaffold.
(2)Drive out the wedges using a pipe and hammer. (A guide for the pipe is in place)
3. Remove a handrail on the right side of the machine.
4. Take out a hopper control switch box from the tool box and insert it into a connector at the center of the hopper
underside. [Cable length: 4 m (13 ft 1 in)]
5. Start the engine and run it at low idling.
6. Depress right UP switch (1) to extend the cylinder rod and set
the upper pin free.
7. Push the right hopper locking lever to the release position
(toward the crusher) to fix the lever with a pin.
8. Depress right DOWN switch (2) to retract the cylinder rod and
to fold the side hopper.
9. Pull the right hopper locking lever to the fixation position
(toward the rear of the machine) to secure the lever with a pin.
10. Carry out the same works for the opposite side, using left UP
switch (3) and left DOWN switch (4).
11. Stop the engine.
12. Detach the hopper control box from the connector and store it in the tool box.
CHANGE OF MACHINE FROM TRANSPORTATION POSTURE TO OPERATION POSTURE
1. Confirm that both right and left hopper locking levers are pulled to the fixation position.
2. Take out a hopper control switch box from the tool box and insert it into the connector at the center of the
machine underside. [Cable length: 4 m (13 ft 1 in)]
3. Start the engine and run it at low idling.
4. Depress right UP switch (1) to extend the cylinder rod, thereby
raising the side hopper, and then confirm that the tip of the
upper pin is on the seat.
5. Depress right DOWN switch (2) to retract the cylinder rod and
let the tip of the upper pin contact the seat closely.
6. Carry out the same works for the opposite side, using left UP
switch (3) and left DOWN switch (4).
7. Stop the engine.
8. Insert a wedge at the right and the left corners of the hopper.
[AGL height of wedges: 3.4 m (11 ft 2 in)]
Working mode
(1) Use a ladder or scaffold.
(2) Climb on the feeder to carry out the work.
9. Remove the feeder in-transport securing pins.
10. Detach the hopper control box from the connector and store it
in the tool box.
3 - 69
https://tractormanualz.com
Summary of Contents for GALEO BR550JG-1
Page 1: ...https tractormanualz com...
Page 2: ...1 1 https tractormanualz com...
Page 4: ...FOREWORD FOREWORD 1 3 https tractormanualz com...
Page 5: ...FOREWORD FOREWORD 1 4 https tractormanualz com...
Page 14: ...2 1 https tractormanualz com...
Page 19: ...SAFETY SAFETY LABELS POSITIONS OF SAFETY PICTOGRAMS 2 6 https tractormanualz com...
Page 50: ...3 1 https tractormanualz com...
Page 93: ...OPERATION OPERATION CHECK OF JAW CRUSHER AND RELATED ACCESSORIES 3 44 https tractormanualz com...
Page 117: ...OPERATION OPERATION UNIT OPERATOR S POSITION AT WORKSITE 3 68 https tractormanualz com...
Page 145: ...OPERATION TRANSPORTATION 3 96 https tractormanualz com...
Page 171: ...4 1 https tractormanualz com...
Page 181: ...MAINTENANCE WEAR PARTS 4 11 https tractormanualz com...
Page 183: ...MAINTENANCE WEAR PARTS 4 13 https tractormanualz com...
Page 189: ...MAINTENANCE STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS 4 19 https tractormanualz com...
Page 256: ...5 1 https tractormanualz com...
Page 258: ...SPECIFICATIONS SPECIFICATIONS 5 3 https tractormanualz com...
Page 259: ...6 1 https tractormanualz com...
Page 275: ...ATTACHMENTS OPTIONS MUCK DISCHARGE CONVEYOR 6 17 https tractormanualz com...