MACHINE OPERATIONS AND CONTROLS
105
3.
Hold the key in starting switch (3) at the HEAT position
and check that the buzzer sounds and preheating monitor
(4) lights up, and that preheating monitor (4) flashes after
that.
After approx. 18 seconds, the buzzer sounds and pre-
heating monitor (4) goes out to indicate that the preheat-
ing is completed.
NOTE
• The monitor and gauge also light up when the key is at the
HEAT position, but this does not indicate any abnormality.
4.
When pre-heating monitor (4) goes off, turn the key in
stating switch (3) to the START position to start the en-
gine.
5.
When the engine starts, release the key in starting switch
(3). The key will return automatically to the ON position.
Summary of Contents for 15001
Page 2: ......
Page 18: ...16 PAGE INTENTIONALLY LEFT BLANK ...
Page 19: ...SAFETY AND ACCIDENT PREVENTION 17 ...
Page 54: ...52 PAGE INTENTIONALLY LEFT BLANK ...
Page 55: ...THE MACHINE AND ITS OPERATIONS 53 ...
Page 156: ...154 PAGE INTENTIONALLY LEFT BLANK ...
Page 157: ...MAINTENANCE 155 ...
Page 207: ...TECHNICAL SPECIFICATIONS 205 ...
Page 216: ...LIFTING CAPACITIES 214 PAGE INTENTIONALLY LEFT BLANK ...
Page 217: ...AUTHORISED OPTIONAL EQUIPMENT 215 ...
Page 232: ...230 PAGE INTENTIONALLY LEFT BLANK ...
Page 233: ......
Page 234: ... 2005 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe ...