10.
Install the Towel Bar
Towel Bar Installation For 600B Shower Doors
Fasten the towel bar bracket to each end of the towel bar using #8-18 x 3/8
″
binding head screws.
Install the towel bar to the outside of the outside panel.
Use two #8-18 x 3/8
″
binding head screws to fasten the brackets to the panel
frame.
Towel Bar Installation For 660B, 690B, 695B, 697B, and 698B Shower Doors
Fasten the towel bar bracket to each end of the towel bar using #8-18 x 3/8
″
flathead screws.
Install the towel bar to the outside of the outside panel.
Use two #8-18 x 3/8
″
flathead screws to fasten the brackets to the panel frame.
Installer le porte-serviettes
Installation de porte-serviettes pour portes de douche 600B
Fixer le support du porte-serviettes sur chaque extrémité du porte-serviettes en
utilisant des vis à tête bombée #8-18 x 3/8
″
.
Installer le porte-serviettes à l’extérieur du panneau externe.
For
Pour
Para
600B
Towel Bar Bracket
Support
porte-serviettes
Soporte del
toallero de barra
Towel Bar
Porte serviettes
Toallero de barra
#8-18 x 3/8" Binding
Head Screw
Vis à tête de fixation
#8-18 x 3/8"
Tornillo sujeción del
#8-18 x 3/8
#8-18 x 3/8"
Flathead Screw
Vis à tête plate
#8-18 x 3/8"
Tornillo de cabeza
plana del #8-18 x 3/8
For
Pour
Para
660B, 690B, 695B,
697B and/et/y 698B
Sterling
21
1063215-2-D
Summary of Contents for STERLING 660B Series
Page 32: ...1063215 2 D ...