Kohler Co.
5
1015627-X2-A
3. Install the Lavatory
Draw a line connecting the two upper anchoring hole marks on the
wall.
Drill a 1/4” mounting holes at the marked lavatory mounting locations
on wood-finished wall, or 5/16” on concrete-finished wall and install
anchor into the mounting holes.
Install the two upper angle brackets to the wall.
Install the faucet and drain to the lavatory according to the
manufacturer’s instructions.
Carefully set the lavatory on the hanger. Level the lavatory, and
carefully secure the lavatory to the wall with lag bolts and washers.
Tighten until snug.
Connect and tighten the trap to the drain, and complete the water
supply connections to the faucet according to the instructions packed
with the faucet.
Apply six self-adhesive gaskets to the top of the shroud as shown.
CAUTION: Risk of product damage.
Do not overtighten the lag
bolts. Overtightening may damage the product.
CAUTION: Risk of product damage.
Do not overtighten the
mounting bolts. Overtightening may damage the product.
Secure the shroud to the angle brackets with bolts and washers
so the shroud is snug against the lavatory underside.