TP-6833 2/16
32 Section 2 Installation
1
1. Typical terminal block location
2. Decal
3. Engine start contacts
4. Auxiliary contacts (see the schematic diagram for contacts
closed on Normal or closed on Emergency)
GM21298
GM21311
4
3
1
2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
24
25
26
27
23
2
Figure 2-36
Engine Start and Auxiliary Contact
Terminal Block, 230--4000 Amp Transfer
Switches
GM89645
Figure 2-37
Typical Auxiliary Contact Connection,
230--4000 Amp Transfer Switches (see
Figure 2-36 and schematic diagram)
2.10 Communication and
Accessory Connections
See Section 4 for accessory and communication
connection instructions.
2.11 Functional Tests
After completion of the mechanical installation and all
electrical connections, perform the functional tests
described in Section 5. The procedures in Section 5 are
required to complete the installation and startup of the
transfer switch.