Identificación del producto
Modelo #K-_______________________
Escriba el número de identificación exacto, copiado de la etiqueta de la caja. Esta
información ayudará a nuestros representantes de servicio al cliente, en caso de
que usted necesitara ayuda en el futuro.
Guarde este manual para referencia futura.
1.
Prepare the Site
Flooring
NOTICE:
Adequate floor support must be provided. Consult the roughing-in
information packed with the bath for specific floor loading requirements.
Install adequate floor support.
NOTICE:
To ensure a successful installation, it is critical that bath be installed on a
level subfloor.
Verify the subfloor is level. Adjust for level, if necessary.
Framing
NOTICE:
The bath must be installed into an alcove.
NOTICE:
Take into account the thickness of the finished wall materials when
constructing the framing.
Construct the framing with 2x4 or 2x6 studs according to the roughing-in
information packed with the bath.
Plumbing
NOTE: For through-the-floor drain installations:
A drain hole will need to be cut to
accommodate the drain connections.
For above-the-floor drain installations:
A hole
will not need to be cut.
Position the plumbing according to the roughing-in sheet packed with the bath.
Verify that the subfloor offers adequate
support, and is flat and level.
Vérifier que le sous-plancher offre un support
adéquat et qu'il soit plat et nivelé.
Verifique que el subpiso proporcione suficiente
soporte y que esté plano y nivelado.
Construct 2x4 or 2x6 stud
framing according to the
roughing-in information.
Construire un cadre de
montant de 2x4 ou de 2x6
suivant l'information du plan
de raccordement.
Construya una estructura de
postes de 2x4 ó 2x6,
conforme al diagrama de
instalación.
Position the rough plumbing.
Positionner la plomberie de
raccordement.
Coloque las tuberías de
plomería.
1084213-2-A
6
Kohler Co.