6. Route the Piping
Showerhead as Primary Outlet
NOTE:
Illustration shows the recommended piping configuration.
Piping may need to be modified to accommodate your specific site.
Install piping and elbows to the showerhead and handshower
supply locations. Use thread sealant on all threaded connections.
Secure the piping to the framing.
Solder all needed connections.
Temporarily install 1/2” pipe nipples to the elbows so they will
extend at least 2” (51 mm) beyond the finished wall.
Install caps to both pipe nipples.
Proceed to the “Reassemble the Valve” section.