background image

Page 11

  

INSTALLATION INSTRUCTIONS

ENGLEFIELD

7

Rotate 90° 

Unlocked

Locked

(a)

Fit the seals. 

Note!

 The longer seals go on the doors. Trim any excess material.

(b)

Lock the top roller assemblies in position by turning the lock through 90º.

(c)

Fit the roller covers.

(d)

Make sure that the doors open and close correctly. Adjust if necessary.

VALENCIA ELITE

Square Sliding

Summary of Contents for Englefield Valencia Elite

Page 1: ...history of making superb showers and their popularity is testament to their quality and affordability It s the details that Englefield cares about from pioneer ing the latest technology to innovative...

Page 2: ...ootwear when lifting panels 4 Wear safety glasses when drilling 1 The wall retainers must be installed onto a waterproof vertical and flat wall surface Failure to do so will result in an unsatisfactor...

Page 3: ...ive 1 x Fittings Kit Phillips VALENCIA ELITE Square Sliding 2 x Wall Channels 2 x Seal Packs 2 x Corner Covers 2 x Doors 1L 1R 2 x Door Frames 1L 1R 2 x Wall Finishing Strips 8 x Roller Covers 4 x 8mm...

Page 4: ...nglefield strongly recommends constructing double studs as below to fix the wall retainers to ATTENTION Page 3 INSTALLATION INSTRUCTIONS A Double studs Double studs B Size Dim A 900 x 900 900 1000 x 1...

Page 5: ...e refer to the instructions supplied with the tray Wall The vertical wall retainers MUST be installed onto the waterproof membrane PRIOR TO WALL TILING If possible the complete door system should be i...

Page 6: ...finished wall to outer edge of retainer Tip Cover the waste to prevent the loss of small parts If installing onto a tray protect the tray surface during installation Page 5 10 mm 10 mm 900 x 900 1000...

Page 7: ...hen remove the wall channels Drill with a 3mm bit For other types of wall structure alternative fixings may be required not supplied b c Apply silicone sealant along the length of the wall and at the...

Page 8: ...correctly oriented with the logo badges and long leg of the seal cap on the outside of the glass b Install the panel assemblies into the wall channels 3 Logo badge on outside of shower CleanLess glas...

Page 9: ...b c d Install the corner brackets in position B Secure the corner brackets with the washers and shortest screws 8mm length Install the caps over the washers Adjust the frame so that it is in the corre...

Page 10: ...rocess for the other wall channel 5 3 mm x4 A A a From the inside of the shower enclosure drill four 3mm holes in the door frame The hole locations are centre marked on the inside of the wall channel...

Page 11: ...Make sure that the roller adjusting screws are facing downwards b Adjust the top rollers with the adjusting screw until the bottom rollers easily clip into the bottom rail c Adjust the rollers to give...

Page 12: ...t the seals Note The longer seals go on the doors Trim any excess material b Lock the top roller assemblies in position by turning the lock through 90 c Fit the roller covers d Make sure that the door...

Page 13: ...24 hours before use c Fit the corner covers to the wall channels They should snap into place d a a a a a a c c d Full length 200mm up Full length Full length 200mm up Full length Installation Complet...

Page 14: ...the homeowners guide and our website for cleaning instructions SPARE PARTS Scan the QR barcode on the packaging or underside of top caps to identify the product SKU and date of manufacture Retainer Co...

Reviews: