background image

8

114543-2-

CB

Kohler Co., Kohler, WI

SHOWERHEAD OPERATION – ALL
MODELS

For three-way showerhead operation, grasp the outer ring
of the showerhead, and gently rotate it clockwise or coun-
terclockwise. There are two small detents within the outer
ring to provide three operating positions.

Fig. #15

6. ADJUSTMENTS – K-1097

MAXIMUM WATER TEMPERATURE
ADJUSTMENT

If the handle and face plate are installed, remove them.

Turn on the water to the maximum temperature by
rotating the valve stem fully clockwise.

To adjust the maximum temperature, slide the O-ring out
of the groove, and part way up the valve stem. Move the
upper limit stop part way up the valve stem. Rotate the
valve stem until the desired maximum water temperature
is achieved. Rotate the lower limit stop until it contacts the
tab. Slide the upper limit stop down the valve stem to
engage the lower limit stop. Slide the O-ring into the valve
stem groove.

Rotate the valve stem counterclockwise to shut the water
off.

Reinstall the handle and face plate.

O-Ring

Upper Limit Stop

Tab

Valve
Stem

Lower Limit Stop

Groove

Fig. #16

7. INSTALL VALVE TRIM

INSTALL ESCUTCHEONS TO 2-HANDLE
YOKE – ALL MODELS

Apply a bead of plumbers putty or other sealant to the
escutcheon according to the putty manufacturer’s
instructions. Install the escutcheons over the threaded
sleeves, and align on the wall. Remove any excess putty
or sealant.

Fig. #17

Threaded Sleeve

Finish Wall

Plumbers Putty

Escutcheon

INSTALL HANDLES TO 2-HANDLE YOKE –
ALL MODELS

Disassemble the handle components.

Slide the insert over the valve so the external threads face
outward. Press the handle adapter onto the valve stem,
and secure with the screw. Press the handle onto the
handle adapter so the slots and tabs engage, then thread
the insert into the handle. Securely hand tighten.

Fig. #18

Handle

Screw

Handle Adapt-
er

Insert

Valve

Correct Handle
Alignment (off
position)

INSTALL SINGLE-CONTROL HANDLE –
K-1097 MODEL

Slide the faceplate over the valve stem, and carefully
secure it with two long screws. Do not overtighten.

Fig. #19

Valve Stem

Faceplate

Screw

Summary of Contents for CORALAIS BODYSPA K-1096

Page 1: ...ower Pay special attention to this feature when planning your site preparation Avoid excessive heat if you solder connections to prevent damage to the fitting Flush all piping thoroughly before installing the valve Observe all local plumbing codes Do not force the handle s in any direction To turn the valve off gently turn to the Off position For the K 1097 do not use any plastic pipe between the ...

Page 2: ... valve when such changes occur Pressure balanced valves may not provide protection against scalding if there is a failure of other temperature limiting devices elsewhere in the plumbing system The installer is responsible for installing the valve and adjusting the maximum water temperature of this pressure balanced valve according to instructions This valve meets or exceeds ANSI A112 18 1M and ASS...

Page 3: ... IMPORTANT Secure the bath and shower piping to the support framing Proceed to Fig 3 Fig 1 10 4 72 78 TO FLOOR TYPICAL SUPPORT FRAMING K 1097 MODEL ONLY Determine the installation location of both valves the showerhead and the spout Install the support framing as required IMPORTANT Secure the bath and shower piping to the support framing Proceed to Fig 4 Fig 2 10 4 72 78 TO FLOOR TYPICAL 48 TO FLO...

Page 4: ...he K 1098 reinstall the aspirator at the top of the yoke Do not overtighten For the K 1097 discard the aspirator Reinstall the valve units with the colored dot valve on the left side right side for ceiling supplies Reinstall the plaster guards For K 1096 model proceed to Fig 6 For K 1097 model proceed to Fig 7 Fig 5 Ceiling Supplies Aspirator Hot Cold D shape Down D shape Up INSTALL 2 HANDLE YOKE ...

Page 5: ... 2 Copper or Pipe 1 2 Adapter or Solder Direct Hot Side Shower Outlet 1 2 Pipe Cap INSTALL SINGLE CONTROL VALVE K 1097 MODEL CAUTION Risk of product damage The shower valve contains plastic components Do not apply excessive heat if you solder the valve connections NOTE If the valve is to be installed in a two valve back to back configuration proceed to Back to Back Installation procedures on Page ...

Page 6: ... out for thick wall installation Install the plaster guard and mud guard over the cap assembly and secure them to the valve body with screws NOTE The finish wall must line up within the front to back depth of the installed plaster guard The plaster guard may be removed after the wall is completed Remove and discard the mud guard Thin Wall Installation Cut a 4 diameter hole in the wall material Ide...

Page 7: ...he temporary nipple from the bath ell Apply thread sealant to the threads of a 1 2 nipple Install the nipple to the bath ell so it extends 3 7 8 beyond the finish wall Carefully thread the spout to the nipple with a clean strap wrench Flush hot and cold water through the spout for one minute Fig 13 3 7 8 Nipple N P T Spout INSTALL SHOWER ARM AND SHOWERHEAD ALL MODELS CAUTION Risk of product damage...

Page 8: ... counterclockwise to shut the water off Reinstall the handle and face plate O Ring Upper Limit Stop Tab Valve Stem Lower Limit Stop Groove Fig 16 7 INSTALL VALVE TRIM INSTALL ESCUTCHEONS TO 2 HANDLE YOKE ALL MODELS Apply a bead of plumbers putty or other sealant to the escutcheon according to the putty manufacturer s instructions Install the escutcheons over the threaded sleeves and align on the w...

Reviews: