background image

4

114543-2-

CB

Kohler Co., Kohler, WI

4. PRE-INSTALLATION PROCEDURES – K-1097 MODEL ONLY

To prevent damage to the Rite-Temp valve components
due to heat while soldering, open the valve as follows:

Remove and save the plaster guard and mud guard.

Rotate the valve stem fully clockwise.

If the valve has stops, rotate both stop adjustments fully
counterclockwise.

Proceed to Fig. #5.

Fig. #4

Valve Stem

Valve Body

Stop

Plaster Guard

Mud
Guard

5. INSTALLATION

INSTALL 2-HANDLE YOKE – ALL MODELS

The yoke has a two-sided pipe adapter that can be
reversed for use with either 1/2” N.P.T. pipe or copper
tubing. Connect the hot and cold supplies to the yoke so
they are between 2” and 3-1/2” from the finish wall.

The faucet fitting is factory assembled specifically for hot
and cold water supplies from the floor. If installing the
faucet for ceiling supplies, turn the yoke over so the
supplies connect from the top.

For the K-1098, reinstall the aspirator at the top of the
yoke. Do not overtighten. For the K-1097, discard the
aspirator.

Reinstall the valve units with the colored dot valve on the
left side (right side for ceiling supplies). Reinstall the
plaster guards.

For K-1096 model, proceed to Fig. #6.

For K-1097 model, proceed to Fig. #7.

Fig. #5

Ceiling
Supplies

Aspirator

Hot

Cold

D-shape Down

D-shape Up

INSTALL 2-HANDLE YOKE – K-1096 MODEL

Install elbows and adapters (if used) onto 1/2” copper
tubing or 1/2” pipe of proper length. Connect the piping to
both the shower and bath yoke outlets.

IMPORTANT! Secure the tubing to the framing.

Install temporary 1/2” nipples into the bath and shower
ells. The temporary nipple used for slip-fit spout
installations must extend at least 6” beyond the finish wall.

Turn on the water supplies. Open both the hot and cold
valves for about one minute to flush debris from the water
lines.

Complete the finish wall, and discard the plaster guards.

Proceed to Fig. #12 or Fig. #13.

Fig. #6

1/2” Copper
or Pipe

Shower Outlet

Bath Outlet

Bath Ell

Shower Ell

1/2” Adapter
or Solder
Direct

1/2” Copper
or Pipe

Summary of Contents for CORALAIS BODYSPA K-1096

Page 1: ...ower Pay special attention to this feature when planning your site preparation Avoid excessive heat if you solder connections to prevent damage to the fitting Flush all piping thoroughly before installing the valve Observe all local plumbing codes Do not force the handle s in any direction To turn the valve off gently turn to the Off position For the K 1097 do not use any plastic pipe between the ...

Page 2: ... valve when such changes occur Pressure balanced valves may not provide protection against scalding if there is a failure of other temperature limiting devices elsewhere in the plumbing system The installer is responsible for installing the valve and adjusting the maximum water temperature of this pressure balanced valve according to instructions This valve meets or exceeds ANSI A112 18 1M and ASS...

Page 3: ... IMPORTANT Secure the bath and shower piping to the support framing Proceed to Fig 3 Fig 1 10 4 72 78 TO FLOOR TYPICAL SUPPORT FRAMING K 1097 MODEL ONLY Determine the installation location of both valves the showerhead and the spout Install the support framing as required IMPORTANT Secure the bath and shower piping to the support framing Proceed to Fig 4 Fig 2 10 4 72 78 TO FLOOR TYPICAL 48 TO FLO...

Page 4: ...he K 1098 reinstall the aspirator at the top of the yoke Do not overtighten For the K 1097 discard the aspirator Reinstall the valve units with the colored dot valve on the left side right side for ceiling supplies Reinstall the plaster guards For K 1096 model proceed to Fig 6 For K 1097 model proceed to Fig 7 Fig 5 Ceiling Supplies Aspirator Hot Cold D shape Down D shape Up INSTALL 2 HANDLE YOKE ...

Page 5: ... 2 Copper or Pipe 1 2 Adapter or Solder Direct Hot Side Shower Outlet 1 2 Pipe Cap INSTALL SINGLE CONTROL VALVE K 1097 MODEL CAUTION Risk of product damage The shower valve contains plastic components Do not apply excessive heat if you solder the valve connections NOTE If the valve is to be installed in a two valve back to back configuration proceed to Back to Back Installation procedures on Page ...

Page 6: ... out for thick wall installation Install the plaster guard and mud guard over the cap assembly and secure them to the valve body with screws NOTE The finish wall must line up within the front to back depth of the installed plaster guard The plaster guard may be removed after the wall is completed Remove and discard the mud guard Thin Wall Installation Cut a 4 diameter hole in the wall material Ide...

Page 7: ...he temporary nipple from the bath ell Apply thread sealant to the threads of a 1 2 nipple Install the nipple to the bath ell so it extends 3 7 8 beyond the finish wall Carefully thread the spout to the nipple with a clean strap wrench Flush hot and cold water through the spout for one minute Fig 13 3 7 8 Nipple N P T Spout INSTALL SHOWER ARM AND SHOWERHEAD ALL MODELS CAUTION Risk of product damage...

Page 8: ... counterclockwise to shut the water off Reinstall the handle and face plate O Ring Upper Limit Stop Tab Valve Stem Lower Limit Stop Groove Fig 16 7 INSTALL VALVE TRIM INSTALL ESCUTCHEONS TO 2 HANDLE YOKE ALL MODELS Apply a bead of plumbers putty or other sealant to the escutcheon according to the putty manufacturer s instructions Install the escutcheons over the threaded sleeves and align on the w...

Reviews: