5.24
Section 5
EFI Fuel System
Figure 5-26. Throttle Link in Center of Hole.
B. Setting the Initial Adjustment
1. Check the split where the clamping screw goes
through the governor lever. See Figure 5-27.
There should be a gap of at least 1/32 in. If the
tips are touching and there is no gap present, the
lever should be replaced. If not already installed,
position the governor lever on the cross sha
ft
, but
leave the clamping screw loose.
3. Rotate the governor lever and sha
ft
counterclockwise until it stops. Use only enough
pressure to hold it in that position.
4. Check how the end of the thro
tt
le linkage aligns
with the bushing hole in the governor lever. See
Figure 5-26. It should fall in the center of the hole.
If it doesn’t, perform the adjustment procedure as
follows.
3. Insert a nail or Allen wrench into the hole in the
top of the cross sha
ft
. Using light pressure, rotate
the governor sha
ft
counterclockwise
as far as it
will turn, then torque the hex nut on the
clamping screw to
6.8 N·m (63 in. lb.)
. See Figure
5-28. Make sure that the governor arm has not
twisted up or down a
ft
er the nut has been
tightened.
Figure 5-27. Checking Split of Clamp.
2. Follow the instructions in Step 2 of Checking the
Initial Adjustment, then rea
tt
ach the thro
tt
le
linkage to the governor lever with the bushing
clip. It is not necessary to rea
tt
ach the damper or
governor springs at this time.
Figure 5-28. Adjusting Governor Shaft.
4. Verify that the governor has been set correctly.
With the linkage still retained in the Full Thro
tt
le
position (Step 2), unsnap the bushing clip,
separate the linkage from the bushing, and
remove the bushing from the lever. Follow Steps
3 and 4 in Checking the Initial Adjustment.
5. Reconnect the dampening spring into its
governor lever hole from the bo
tt
om. Reinstall
the bushing and rea
tt
ach the thro
tt
le linkage. See
Figure 5-24. Rea
tt
ach the governor spring in the
marked hole.
6. Start the engine and allow it to fully warm up
and establish closed loop operation
(approximately 5-10 min.). Check the speed
se
tt
ings and adjust as necessary,
fi
rst the low idle
speed, and then the high-speed se
tt
ing.
NOTE: Thro
tt
le body and air cleaner assembly
must be securely fastened with three hex
fl
ange nuts to the intake manifold prior to
a
tt
empting to set the governor.
Summary of Contents for Command PRO ECV630
Page 1: ...SERVICE MANUAL ECV630 ECV749 VERTICAL CRANKSHAFT ...
Page 2: ......
Page 4: ......
Page 20: ...1 16 Section 1 Safety and General Information ...
Page 70: ...5 38 Section 5 EFI Fuel System ...
Page 92: ...7 18 Section 7 Electrical System and Components ...
Page 110: ...8 18 Section 8 Disassembly ...
Page 124: ...9 14 Section 9 Inspection and Reconditioning ...
Page 151: ......