![Kohler AERODYNE K-3869T-S Installation Instruction Download Page 4](http://html.mh-extra.com/html/kohler/aerodyne-k-3869t-s/aerodyne-k-3869t-s_installation-instruction_1989919004.webp)
-4-
Firmly press the toilet gasket onto the
toilet outlet of plastic trap.
Wax ring type toilet gasket
should not be installed at temperatures
less than 21 C.
If you are using a toilet
gasket with an integral plastic sleeve,
make sure the gasket is positioned
with the sleeve facing away from the
toilet.
NOTE 1:
NOTE 2:
o
1
21
2
o
C
Install brackets.
Fig.#7
7
Plastic Trap Outlet
Toilet Gasket
Fig.#6
6
Fig.#4
4
TO INSTALL BOWL
Position the template and align with
drain hole.
Mark down the position of foot and 5
holes.
Drain Hole
Fig.#5
5
3/8
10mm
10mm
5
Drill holes on ground with the drill of
10mm (3/8"), then insert anchor to
holes.
CAUTION:
Please make sure there is
no water pipe or spool under the 5
holes to be drilled.
mm
67mm;
67
mm
194
Fig.#3
3
TO INSTALL SUPPLY
SHUT-OFF VALVE
Install the supply shut-off valve so it is
67mm (2-5/8") above the finished floor
line, and 194mm (7-5/8") to the left of
the closet flange centerline.
The centerline of the supply shut-off
valve outlet should extend 67mm
(2-5/8") from the finished wall. Install
the supply shut-off valve with the outlet
vertical.
Supply Shut-Off Valve
Closet Flange
Centerline
200
305/400
67
1195897-T01-G