TP-6137 5/03
87
Section 10 Generator and Engine Disassembly/Reassembly
High Pressure Line
1. Install the high pressure line and tighten the nuts at
the injector nipple and at the nonreturn valve nipple
located on the fuel injection pump body.
Note:
Perform step 1 while holding the injector and
nonreturn valve nipples with a 14 mm wrench.
See Figure 10-97.
2. Tighten the fuel line nuts with a 17 mm wrench.
Figure 10-97
High Pressure Line
Valve Cover
1. Install the valve cover gasket on the upper surface
of the head. See Figure 10-98.
2. Reinstall the valve cover.
3. Put the synthetic rubber washers under the cover
nuts and tighten at the specified torque.
See
Section 1.5.
Note:
To avoid oil leaks, check and hold the right side of
the gasket on the head during this operation.
Figure 10-98
Valve Cover Gasket
Summary of Contents for 3.5EFOZ
Page 1: ...Marine Generator Sets Includes Engine Maintenance Models 4EOZ 3 5EFOZ TP 6137 5 03 Service ...
Page 10: ...TP 6137 5 03 VI Safety Precautions and Instructions Notes ...
Page 12: ...TP 6137 5 03 ii Service Assistance Notes ...
Page 28: ...TP 6137 5 03 16 Section 3 Scheduled Maintenance Notes ...
Page 42: ...TP 6137 5 03 30 Section 5 Fuel System Notes ...
Page 48: ...TP 6137 5 03 36 Section 6 Cooling System Notes ...
Page 102: ...TP 6137 5 03 90 Section 10 Generator and Engine Disassembly Reassembly Notes ...
Page 104: ...TP 6137 5 03 92 Section 11 Wiring Diagrams 11 1 Wiring Diagram Schematic GM20645 B ...
Page 105: ...TP 6137 5 03 93 Section 11 Wiring Diagrams 11 2 Wiring Diagram Point to Point GM20645 B ...
Page 106: ...TP 6137 5 03 94 Section 11 Wiring Diagrams Notes ...
Page 114: ......
Page 115: ......