4. Install the Valve
Shut-Off Valve
Hot
Cold
Board Mount
Bracket Mount
Route 22 mm dedicated water supply lines to supply the product.
Route 3/4 (1" PEX) dedicated water supply lines. Use unions to install removable pipe segments to the valve inlets to
allow access for periodic cleaning of the inlet screens.
Install shut-off valves in the supply lines before the valve.
Hold the valve up to the installation location. Verify fit and mark the hole locations.
Predrill the holes.
Secure the valve with the washers and screws. Do not overtighten!
IMPORTANT! When routing piping, the number marked at each valve outlet must correspond to the appropriate shower
fitting for preprogrammed or custom showering experiences to function properly. Refer to the Homeowners Guide for
more information.
Route 15 mm pipework from the valve outlets to the appropriate shower fitting following the recommended pipe
fitting sizes listed.
Connect the hot and cold supply lines to the appropriate valve inlets. Hot is red and marked with “HOT,” cold is blue
and marked with “COLD.”
Secure all piping to the framing.
1430528-W2-
A
16
Kohler Co.