K90100/K90190 Auto Melting Point Unit
Operation and Technical Manual
Page 8
Koehler Instrument Company, Inc.
1595 Sycamore Avenue • Bohemia, New York 11716-1796 • USA
Toll Free: 1-800-878-
9070 (US only) • Tel: +1 631 589 3800 • Fax: +1 631 589 3815
http://www.koehlerinstrument.com • e-mail: [email protected]
Petroleum Testing & Analysis Instrumentation • Custom Design & Manufacturing
on each chemical reagent for additional information. MSDS information can be easily
located on the internet at http://siri.uvm.edu or http://www.sigma-aldrich.com.
3 Unpacking and Installation
The instructions for preparing the equipment assume that the user is aware of the
contents of this document, which lists the warranty conditions and important precautions.
3.1 Packing List
Automatic Melting Point Range Apparatus (K90100 or K90190)
Black and White 6” Monitor and Power Adapter
Furnace Cover Plate
Connecting Cables
Spatula
Sample Preparation Jig
Power Cord
Spare Fuses
– 1A and 2A (two each)
3.2 Accessories
(ordered separately)
1. K90104 Glass Slides and Cover Slips (pack of 100)
3.3 Unpacking
Carefully unpack and place the equipment in a secure location. Use extra care while
unpacking glass pieces. Ensure that all parts and accessories listed in previous section are
present. Inspect the unit and all accessories for damage. If you find any damage, keep all
packing materials and immediately report the damage to the carrier. We will assist you with
your claim, if requested. When submitting a claim for shipping damage, request that the
carrier inspect the shipping container and equipment. Do not return goods to Koehler
without written authorization.
3.4 Equipment Placement
Place the apparatus on a firm, level surface in an area with adequate ventilation.
Make sure that the unit is leveled, if appropriate. Please note that Koehler does not supply
a spirit level with this equipment.