HANDLING OF THIS MACHINE
SPECIFIED WORKS
This machine is mainly intended for the following uses:
・
Digging work
・
Trenching work
・
Loading work
・
Ground leveling work
・
Demolition work
For more information about work procedures, see chapters "MACHINE OPERATION" and "OPTIONAL
EQUIPMENT".
FRONT/REAR AND RIGHT/LEFT OF THE MACHINE
In this manual, front/rear and right/left are
determined by looking forward from the operator's
seat with the travel motors at the rear side.
Front
Right
Travel Motor
Left
BREAK-IN
This machine is shipped after enough adjustment
and examination. However, early high-load
operations may speed up decline of functions and
shorten the service life of the machine.
Break in the machine in three stages listed to the
right until every part gets broken in.
Hour Meter
Less than 10 hours
Less than 100 hours
100 hours and more
Load Status
About 60 %
About 80 %
Full load
During break-in, especially note the followings:
・
Avoid works with heavy load or at high speed.
・
Avoid dash start and dash acceleration, and unnecessary urgent stop and rapid turn.
Use extreme caution to put a full load on the machine before its parts and components get broken in
because it may cause seizure or scratches and significantly affect the service life of the machine.
[
FOREWORD
]
0-
5
Copyright©2019 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2PS00017ZE08] [1226CsCshWbYs]