5. After installation is complete, attach the propane
conversion label (in the conversion kit bag) next to the
boiler rating plate. Attach the LP caution label (in the
conversion kit bag) to the left side of the unit in the
lower left corner.
6. Replace the top and front access covers.
11
2
Prepare boiler
(continued)
Figure 2-3 Installing Propane Orifice
Figure 2-4 Leveling Legs on the Boiler
Leveling the boiler
1. Set the boiler in place and check level.
a) Adjust legs if necessary to level boiler, see FIG. 2-4
below.
WARNING
After converting to LP, check combustion
per the Start-up procedure in Section
7 of this manual. Failure to check and
verify combustion could result in severe
personal injury, death, or substantial
property damage.
LP Conversion Table
Model
LP Orifice Stamping
151
150
211
210 / W150
286
285
Table 2A LP Conversion Table
Outdoor Knight Boiler Installation & Operation Manual