![KMC Controls 69 Series Operator'S Manual Download Page 43](http://html.mh-extra.com/html/kmc-controls/69-series/69-series_operators-manual_1979499043.webp)
41
MAINTENANCE
SERVICE SCHEDULE
The 6900 KMC Subsoiler Leveler has been carefully designed and manufactured to provide
years of dependable service. To maximize use and reduce downtime and repair costs, regular
maintenance should be performed on the Subsoiler Leveler. Below is a guide for minimum
recommended services and the time intervals for their completion. However, since these machines are
used in many different conditions and applications, the operator should customize the maintenance
schedule to best fit their individual needs.
SERVICE
EVERY
10 HOURS
EVERY
50 HOURS
EVERY
250 HOURS
1
INSPECT RIPPER POINTS
(REPLACE AS NEEDED)
X
2
INSPECT WEAR SHINS
(REPLACE AS NEEDED)
X
3
LUBRICATE ALL GREASE POINTS
X
4
CHECK TORQUE ON ALL BOLTS
(See Bolt Torque Chart in Section
on General Assembly Set-up)
X
(INITIAL)
X
5
INSPECT HITCH PINS FOR WEAR
X
6
INSPECT FRONT COULTER DISC
(REPLACE AS NEEDED)
X
7
INSPECT BEARINGS
ON COULTERS AND ROLLERS
X
8
OPTIONAL SCRAPER-ADJUST POSITION
AGAINST SPIKED ROLLER
X
9
INSPECT RIPPER SHANKS AND TRIP
MECHANISMS FOR ANY DAMAGE
X
10 INSPECT TOOLBAR FOR ANY DAMAGE
X
*NOTE: Front Coulter Bearings and Rear Spiked Roller Bearings are non-relub.