40
START-UP
Before initial operation of this piece of equipment, review the “
Pre-Operational Checklist
” at
the front of this manual. Make sure all fields of the checklist have been performed and make any notes
necessary for future operators. Your piece of equipment should now be ready for field operation.
NOTES: