2-3-1 FLUE
The provision for satisfactory flue termination must be installed in accordance with local regulations.
The appliance must be installed so that the flue terminal is exposed to outdoor air.
The terminal must not discharge into another room or space such as an outhouse or lean-to. It is important that the
position of the terminal allows a free passage of air across it at all times. The terminal should be located with due
regard for the damage or discoloration that might occur on buildings in the vicinity,
it must also be located in a place not likely to cause nuisance. In cold or humidity weather water vapor may condense
on leaving the flue terminal The effect of such “steaming” must be considered. If the terminal is less than 1 meter
above a balcony, above ground or above a flat roof to which people has access, then a suitable stainless steel terminal
guard must be fitted. The minimum acceptable spacing from the terminal to obstructions and ventilation openings
are specified in Fig. X.
2-3-2 Installing flue (Connecting)
COAXIAL FLUE Connecting
ASSEMBLING the socket of inlet and outlet flue.
1. Join the flue socket on flue outlet.
2. After sealing the top of boiler and socket with gasket,
fix the socket to the boiler body with screw.
JOINING FLUE WITH BOILER
1. Fix the socket, boiler adapter and flue elbow with sealing
tape after adjusting all.
2. After sealing well, join and screw the flue duct adapter.
3. Join and fix the flue elbow to main flue with careful check
of exhaust flue and inlet flue.
4. Seal the joint completely with tape and screw the Flue
duct adapter.
5. Slope down the flue outlet by 3 ~ 5
˚
in order to drop the
condensation down.
Flue Air Duct
Flue Duct Adapter
Gasket
Flue Elbow
Flue Duct Adapter
Boiler Adapter
Gasket
Socket
Exhaust Flue
9페이지