
MQZCV48
Basic Finishing 3: MQZCV48DD Doors
Step One: Frame Fireplace with nailing tabs oriented as
shown.
Step Two: Use Drywall to finish face of wall.
NOTE: Wall will be flush with fireplace face.
Step 3: A stone, brick, or other non-combustible border
may be applied to the wall. Maintain clearances from
fireplace opening below.
IMPORTANT NOTE!
When installing stone, brick, or other
material around the perimeter of the surround:
You MUST Leave 2-5/8” of the fireplace face exposed around
the fireplace opening on the Sides, 2” at the Bottom, and 3-
1/8” must be exposed on the top. This is to install and remove
the Door Frame. See drawings below.
A Tile Lip Kit (ZCV-TLK) is available.
Nailing Tab
Fireplace Frame
2
-5
/8
” M
IN
Drywall
3-1/8” MIN
Stone, Brick, Tile, etc.
Back Frame of
MQZCV48DD Door
(Continued)
MQZCV48DD1
MQZCV48DD2
MQZCV48DD3
19
Summary of Contents for MQZCV48LP
Page 20: ...ZCV48 Fireplace Opening Required Clearance ZCV48 Fireplace Opening Required Clearance 20...
Page 52: ...Gas Conversion for Modulator PART C 52...
Page 57: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 57...
Page 58: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 58...
Page 65: ...Proflame 2 Remote Control 65...
Page 67: ...67...