
19
CORNER FRAMING SPECIFICATIONS
FRAMING
Using 2x4s frame to local building codes.
DO NOT install against a vapour barrier or exposed insulation.
Framing measurements have been adjusted to accommodate a
1/2” thick finished wall. FIGURE 11.
Combustible materials may be installed flush with top and sides
of fireplace.
It is not necessary to install a hearth with this fireplace system.
Objects placed in front of the fireplace should be kept a
minimum of 24” away from the front face.
Fireplace bottom supplies you with two 6” x 8” rectangular
holes. The use of these holes depends on valve and Fireplace
location on riser or upper floor.
NOTE
If the unit is installed in a non conventional
manner not using 2x4 framing the nailing tabs
may be removed and the Heat shields may be
placed directly against a combustible wall or
partition.
When the unit is installed without nailing tabs the
unit must be secured to the floor using the holes
located in the bottom of the fireplace.
FIREPLACE ASSEMBLY
1. Mount Door Cover on one end. Figure #12. Position
Door Cover over opening as shown in diagram and using
4 self tapping screws secure onto fireplace. Check to see
that door cover is properly sealed.
2. Hang Heat Shield on top edge of Fireplace and secure
with self tapping screws. Heat Shield must be centered
allowing a 1/2” clearance both sides of Fireplace for
finishing material.
3. The Heat Shield is equipped with nailing tabs if 2x4
framing is used as shown in diagram. Level Fireplace and
nail or screw into place.
When not using 2x4 framing secure Unit with screws at
bottom (SEE ABOVE NOTE:)
NOTE: Use 8-18 x 3/4 DT screws for bottom of door cover
NOTE: Holes for mounting sides of heat shield are not
pre-punched.
Figure 12
Corner Fireplace Shown
Figure 11
Summary of Contents for GLMVF40MVN
Page 2: ...2...