
17
SEE-THROUGH FRAMING SPECIFICATIONS
FRAMING
Using 2x4s frame to local building codes.
DO NOT install against a vapour barrier or exposed insulation.
Framing measurements have been adjusted to accommodate a
1/2” thick finished wall. FIGURE 7.
Combustible materials may be installed flush with top and sides
of fireplace.
It is not necessary to install a hearth with this fireplace system.
Objects placed in front of the fireplace should be kept a minimum
of 24” away from the front face.
Gas line installation should be performed only after Fireplace
installation. Fireplace bottom supplies you with two 6” x 8”
rectangular holes. The use of these holes depends on valve and
Fireplace location on riser or upper floor.
NOTE
If the unit is installed in a non conventional
manner not using 2x4 framing the nailing tabs
may be removed and the Heat Shields may be
placed directly against a combustible wall or
partition.
When the unit is installed without nailing tabs
the unit must be secured to the floor using the
holes located in the bottom of the fireplace.
FIREPLACE ASSEMBLY
1. Mount Door Cover on one end. Figure #8.
Position Door Cover over opening as shown in
diagram and using 4 self tapping screws secure onto
fireplace. Check to see that door cover is properly
sealed.
2. Hang Heat Shield on top edge of Fireplace and
secure with self tapping screws. Heat Shield must be
centered allowing a 1/2” clearance both sides of
Fireplace for finishing material.
3. The Heat Shield is equipped with nailing tabs if
2x4 framing is used as shown in diagram. Level
Fireplace and nail or screw into place.
When not using 2x4 framing secure Unit with screws
at bottom (SEE ABOVE NOTE:)
Figure 7
Figure 8
Summary of Contents for GLMVF40MVN
Page 2: ...2...