background image

ASSEMBLY

5. 

The following assembly MUST be performed by a minimum of two  

people.

 Lift up the main impellor housing (A) Fig.7 and position it over the 

left and right columns (B) and drum lid supports (C) as shown.  

 
6. Secure the main impellor housing (A) Fig.7 to the columns (B) using 8 

flange head hex. bolts and washers. Secure the main impellor housing to 
the drum lid supports (C) using 4 flange head hex. bolts. 

 
 
 
 
 
 
 
 
 
 
 
 
7. Install the intake housing (A) Fig.8 to the bottom of the main impellor       

housing (B) using 8 flange head hex. bolts. Make sure the intlet opening (C) 
is facing in the correct direction as shown in Fig.8. 

 
8. Install the cyclone funnel (D) Fig.8 to the bottom of the intake housing (A) 

using 8 flange head hex. bolts and flange head hex. nuts. 

 
9. Position the collapsible hose (E) Fig.8 over the opening of the cyclone      

funnel and secure it in place using the hose clamp (F). 

 
 
 
 
 
 
 
 
 
 
10. Install drum lid (A) Fig.9 to the drum lid supports (B). Secure drum lid using 

the 4 flange hex. nuts and washers (C). 

 
11. Position the collapsible hose (D) Fig.9 over the lip of the drum lid. Secure 

collapsible hose to drum lid using the bottom hose clamp (E). 

 

FIGURE 7

FIGURE 8

FIGURE 9

Summary of Contents for KC-8150C

Page 1: ...INSTRUCTION MANUAL MODEL KC 8150C 1 5 HP 120V COPYRIGHT 2019 ALL RIGHTS RESERVED BY KING CANADA TOOLS INC CYCLONE DUST COLLECTORS MODEL KC 8200C 2 HP 240V MODEL KC 8300C 3 HP 240V...

Page 2: ...d tear negligence or accidents repairs done by an unauthorized service center alterations and lack of maintenance King Canada shall in no event be liable for death injuries to persons or property or f...

Page 3: ...ries or attachments 16 AVOID ACCIDENTAL STARTING Make sure the swich is in the OFF position before plugging in 17 USE RECOMMENDED ACCESSORIES Consult the manual for recommended accessories Follow the...

Page 4: ...r to keep airborne wood dust in heavy usage within acceptable limits you must regularly monitor airborne dust and maintain the cyclone dust collector to avoid exceeding dust limits Each application is...

Page 5: ...s properly grounded have it checked by a qualified electrician If it should malfunction or breakdown grounding provides a path of least resistance for electric current to reduce the risk of electric s...

Page 6: ...29 gallon Dust port opening 2 x 4 1 x 6 Motor 1 5 HP 15 Amp Voltage 120V 1 phase 60 Hz Assembled dimensions LxWxH 26 x 47 x 70 Weight 247 lbs MODEL KC 8200C Air suction capacity Real Nominal 1071 1650...

Page 7: ...s and washers for each column Notice the placement of the columns as shown in Fig 4 3 Install the drum lid supports E Fig 4 to the base B using 2 flange head hex bolts each support Notice the placemen...

Page 8: ...pellor housing B using 8 flange head hex bolts Make sure the intlet opening C is facing in the correct direction as shown in Fig 8 8 Install the cyclone funnel D Fig 8 to the bottom of the intake hous...

Page 9: ...s as shown 14 Install the drum handle D Fig 10 on the drum using 2 pan head screws washers and acorn nuts 15 Install drum pressure hose A Fig 11 to the fitting on the drum Slide hose over fitting and...

Page 10: ...ousing and secure it using the 6 flange head hex bolts A Fig 13 Obtaining help from a second person is recommended 18 Install the top plate C Fig 14 using the 6 flange head hex bolts D 19 Install the...

Page 11: ...e cyclone dust collector motor ON This magnetic switch is equipped with an Emergency Twist OFF Stop button C which turns the cyclone dust collector motor OFF To reset the magnetic switch and to turn t...

Page 12: ...sses and a filter mask If any servicing other than the above cleaning becomes necessary it should be performed by an authorized service centre CAUTION WEARING A PARTICLE MASK RESPIRATOR FOR PROTECTION...

Reviews: