![KINETICS Brompton Hub Installation Manual Download Page 7](http://html1.mh-extra.com/html/kinetics/brompton-hub/brompton-hub_installation-manual_1968516007.webp)
7
Battery mounting cont…
The next part of the battery mounting is now bolted to the other half already on the bike. There six nuts
and bolts for this, that are fitted along the top and bottom edge, bolts through the front, nuts on the
back.
The lock that is fitted to this has been deliberately left loose as it’s easier to fit this part of the casing with
it like this.
Don’t forget to tighten the two bolts to properly secure the lock in place when you’re done
tightening the other six nuts/bolts.
Ensure that the moulded plug it sitting in the correct position before fitting the two halves together—see
below-right.
Display
The LCD would normally be fitted on the left as shown below. Use a 3mm allen key to release the clamp,
and then tighten to secure in position. The bolt is accessed from the underside of the display.
DO NOT FIT THE BATTERY AT THIS STAGE