17
Chapter 3 Installation
3.1 Tank Assembly
Firstly, we open the box, take out all the components and put it on the table lightly. (Note: There are
many devices, be careful when installing to prevent some devices from being lost)
3.1.1 Lower metal backplane copper column and battery installation
Step 1: The installation of the copper plate under the metal bottom plate
Figure 3-1-1 Schematic diagram of copper column installation on lower metal bottom plate
Figure 3-1-2 Under metal floor copper column installation effect diagram